All rights reserved to the presidency Copyright © 2020
The establishment of the first stage of the quarry service road in the distance between the Al-Musheer tunnel to the Suez-Zaafarana Road, a concrete road that was designed to withstand heavy vehicles. It is a double road with a length of 37 kilometers and a width of 8 meters in each lane.
The project is shown in the video attached (1:19:37 to 1:20:34).
The establishment of the first stage of the quarry service road in the distance between the Al-Musheer tunnel to the Suez-Zaafarana Road, a concrete road that was designed to withstand heavy vehicles. It is a double road with a length of 37 kilometers and a width of 8 meters in each lane.
The project is shown in the video attached (1:19:37 to 1:20:34).