All rights reserved to the presidency Copyright © 2020
It is 850 meters long and 47 meters wide, and it consists of two directions and three traffic lanes linking Mehwar El-Moshir Tantawy with Abu Zaid Khedr. It is implemented by El-Soadaa Group under the supervision of the Engineering Corps of the Armed Forces.
The project is shown in the video attached (33:13 to 34:16).
It is 850 meters long and 47 meters wide, and it consists of two directions and three traffic lanes linking Mehwar El-Moshir Tantawy with Abu Zaid Khedr. It is implemented by El-Soadaa Group under the supervision of the Engineering Corps of the Armed Forces.
The project is shown in the video attached (33:13 to 34:16).