This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

The Inauguration of Dr. Gamal Hemdan Axis (El-Maragha)

The 3.7-Km-long axis consists of three traffic lanes in each direction. It has 5 industrial works with a total length of 1263 metres, including the Nile Bridge with a length of 1150 metres.

It serves the residents of Sohag Governorate, connecting the Western Aswan Agricultural Road to the Eastern Aswan Agricultural Road.

Icon
Icon
Icon
Roads, Bridges and Tunnels May 2024

The Inauguration of Dr. Gamal Hemdan Axis (El-Maragha)

The 3.7-Km-long axis consists of three traffic lanes in each direction. It has 5 industrial works with a total length of 1263 metres, including the Nile Bridge with a length of 1150 metres.

It serves the residents of Sohag Governorate, connecting the Western Aswan Agricultural Road to the Eastern Aswan Agricultural Road.