This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

Extension of Mehwar El-Moshir

The construction of a new traffic axis parallel the Mehwar El Moshir is planned to ease the traffic density and connect it to the October 6 bridge in order to serve those coming from downtown and heading to New Cairo and Ain Sokhna and vice versa, with a length of 8 km and a width of 30 meters in two directions, each direction has 3 traffic lanes. The axis is implemented in Cairo under the supervision of the Engineering Authority of the Armed Forces.

The project is shown in the video attached (35:30 to 36:32).

Icon
Icon
Icon
Roads, Bridges and Tunnels May 2019

Extension of Mehwar El-Moshir

The construction of a new traffic axis parallel the Mehwar El Moshir is planned to ease the traffic density and connect it to the October 6 bridge in order to serve those coming from downtown and heading to New Cairo and Ain Sokhna and vice versa, with a length of 8 km and a width of 30 meters in two directions, each direction has 3 traffic lanes. The axis is implemented in Cairo under the supervision of the Engineering Authority of the Armed Forces.

The project is shown in the video attached (35:30 to 36:32).