Inauguration of Abu Zenima Seawater Desalination Plant

A seawater desalination plant was established in Abu Zenima City, with a capacity of 20 thousand m3/day, and the project consists of:

• A 20×30 m desalination building.
• A 4×8 m storage units.
• Different-sized network of pipes in diameter.
• A 11 x 20 m administrative building.
• A seawater intake.
• A 6 x 20 m transformers and generators building.
• A 450 m-long wall.
• 4 desalination units with a capacity of 5000 m3/day.
• 2 electricity generators with a throughput capacity of 1500 kVA.
• Preliminary treatment facilities.
• Water pumps.
• filters.
• Energy saver through water reuse, thus saving 40% of the consumed energy.
• Two polyethylene lines (400 mm - 500 mm in diameter), with a total length of 21 km and at a pressure of (10 - 16) bar.

 

Icon
Icon
Icon
Drinking Water and Wastewater Sep 2021

Inauguration of Abu Zenima Seawater Desalination Plant

A seawater desalination plant was established in Abu Zenima City, with a capacity of 20 thousand m3/day, and the project consists of:

• A 20×30 m desalination building.
• A 4×8 m storage units.
• Different-sized network of pipes in diameter.
• A 11 x 20 m administrative building.
• A seawater intake.
• A 6 x 20 m transformers and generators building.
• A 450 m-long wall.
• 4 desalination units with a capacity of 5000 m3/day.
• 2 electricity generators with a throughput capacity of 1500 kVA.
• Preliminary treatment facilities.
• Water pumps.
• filters.
• Energy saver through water reuse, thus saving 40% of the consumed energy.
• Two polyethylene lines (400 mm - 500 mm in diameter), with a total length of 21 km and at a pressure of (10 - 16) bar.