All rights reserved to the presidency Copyright © 2020
The project is shown in the documentary film made by the Armed Forces Morale Affairs Department (from 53:58 to 54:17).
The station and its networks were built with a capacity of 86 thousand cubic meters per day to serve about 550 thousand citizens.
The project is shown in the documentary film made by the Armed Forces Morale Affairs Department (from 53:58 to 54:17).
The station and its networks were built with a capacity of 86 thousand cubic meters per day to serve about 550 thousand citizens.