The Light Rail Transit (LRT) project is 103 km long and has 19 stations, serving about a million passengers on a daily basis. The project was implemented over three phases:
Phase I covers 70 km in length and includes 12 stations.
Phase II covers 18.5 km in length and incudes 4 stations.
Phase III covers 16 km in length and includes 3 stations.
The total number of trains is 22 trains, each composed of 6 carts. The frequency of trains is 2.5 minutes and the speed of operation is 120 km / h.
There are 15 industrial works located on the LRT track, including: 7 bridges, 3 tunnels, 4 car bridges, and a car tunnel.
LRT interchanges service with Metro Line 3 at Adly Mansour Central Station, the East Nile Monorail (the Administrative Capital at the City of Arts and Culture station) and the first line of the high-speed electric rail network at the Capital's Central Station.
The project aims to serve the new cities along the track such as El Obour City, Al Shorouk, Mostakbal City, Badr City, 10th of Ramadan and the Administrative Capital. It saves fuel worth 1.7 billion EGP on an annual basis.
The Light Rail Transit (LRT) project is 103 km long and has 19 stations, serving about a million passengers on a daily basis. The project was implemented over three phases:
Phase I covers 70 km in length and includes 12 stations.
Phase II covers 18.5 km in length and incudes 4 stations.
Phase III covers 16 km in length and includes 3 stations.
The total number of trains is 22 trains, each composed of 6 carts. The frequency of trains is 2.5 minutes and the speed of operation is 120 km / h.
There are 15 industrial works located on the LRT track, including: 7 bridges, 3 tunnels, 4 car bridges, and a car tunnel.
LRT interchanges service with Metro Line 3 at Adly Mansour Central Station, the East Nile Monorail (the Administrative Capital at the City of Arts and Culture station) and the first line of the high-speed electric rail network at the Capital's Central Station.
The project aims to serve the new cities along the track such as El Obour City, Al Shorouk, Mostakbal City, Badr City, 10th of Ramadan and the Administrative Capital. It saves fuel worth 1.7 billion EGP on an annual basis.